nitrogen kickoff
(noun) A well activation technique in which nitrogen gas is injected into the tubing or annulus to lighten the hydrostatic column and reduce bottomhole pressure, enabling reservoir fluids to flow to the surface. Nitrogen kickoff is commonly used to unload kill fluid or completion fluid after workover operations.